x
86-21-50312221

Congratulation to Chongqing Wanlilai Chemical Co., Limited Natural Gas CHP project put into operatio

2019-09-24

This project was equipped with one set of Solar Taurus 70 gas turbine generator set (T70-10301S, single set ISO output power is 7500 kW) and one set of 13 t/h medium temperature and pressure HRSG. All the power produced by gas turbine was consumed by plant itself and the exhaust gas enters into HRSG to produce steam to the process.

推荐新闻 更多>>
  • Successful comp...

    2019-04-01

    Solar Training ..